Reducing the Cost of Operating a Data Center
This webinar explains why cooling power dominates data center energy use and how better airflow management lowers it. It is aimed at operators and engineers who want to estimate savings before changing fans or set points.
What the webinar covers
The talk begins with Power Usage Effectiveness (PUE) and notes that cooling is the largest part of the facility energy above the IT load. PUE also looks poor in a new, lightly loaded hall, so the presenter prefers to look at cooling energy against IT load, which is the idea behind ASHRAE Standard 90.4. The presenter breaks total cooling power into room fan power plus the heat rejection work, which is described by the coefficient of performance (COP). The talk explains how to spot-check COP by comparing the IT load at the uninterruptible power supply (UPS) with the cooling power at the transfer switch.
Next the talk links airflow to chiller efficiency. Supplying more air than the servers need creates bypass airflow, which lowers the return air temperature and hurts the heat exchanger. Supplying too little causes recirculation. The Return Temperature Index (RTI) compares what the servers need with what the cooling units supply, and the fan affinity law explains why slowing fans saves so much energy.
The worked example is a one-megawatt raised floor hall with ceiling plenum return and end caps on the rack rows, modeled with computational fluid dynamics (CFD). The baseline supplies more air than the racks need and has cold rack inlets. The presenter adds variable frequency drives (VFDs) controlled by rack inlet temperature, then raises the supply temperature by about eight degrees Fahrenheit. The same exercise is repeated at half load, comparing six and ten air handlers. The session ends with questions on hot versus cold aisle containment and underfloor partitions.
Key points
- Cooling power is the largest term above the IT load, so airflow and heat rejection efficiency are where energy savings come from.
- A rule of thumb in the talk is about 125 cubic feet per minute (CFM) per kilowatt of IT load, which assumes a 25 degree Fahrenheit temperature rise across the servers. Use it to size supply air, then check distribution.
- Fan power varies with the cube of fan speed. The presenter says a 20 percent speed reduction cuts fan energy by about half.
- Installing variable speed fans does not guarantee savings. Without airflow management, fans may run at full speed anyway or leave hot spots at the end of a row.
- Fix air management first, then raise the supply temperature. The presenter says to do it in steps and to measure, and notes that modeling lets you try the change without risk to equipment.
- In the half-load case, running all ten air handlers at low speed used less energy than running six at higher speed. The presenter attributes this to the fan law.
- The presenter estimates that air management commonly saves 20 percent or more of data hall operating cost, and the example model’s predicted savings were of that order. Results depend on the hall, and the example had no economizer.