Transient CFD Simulations for Data Centers
This webinar explains how to estimate the temperature rise in a data hall when cooling fails. It is aimed at engineers and facility managers who need to know how much time they have to respond.
What the webinar covers
The session opens with an introduction to the electronics cooling tool that shares its meshing and solver technology with CoolSim, and to how transient (time-varying) simulation works in electronics packaging. A guest from ANSYS describes that tool’s transient capabilities, including conduction, convection, radiation and fan control inside an enclosure.
The main example is a transient study of a data hall that uses chilled water. The presenter first separates the failure cases. Direct expansion units and in-room air handlers can be studied with a steady-state N+1 analysis: switch one unit off, run the case, and repeat for each unit. Total loss of cooling is the second case, and the presenter shows it mainly to explain why it is not very informative: rack inlet temperatures rise past the limit within seconds.
The third case is a chiller failure while the pumps and air handlers keep running on backup power. The cold water already in the loop keeps the hall cool until the first warm water returns to the air handlers. The presenter shows how the volume and flow rate of that loop set the timing, and how the supply water temperature then climbs in a stair-step pattern as each slug of warm water arrives. Each step is run as its own steady-state solution with a reduced cooling capacity, and the study stops when a rack inlet reaches the limit.
The talk closes with questions on mixed cooling systems, control logic, server fan behavior and the computing cost of transient runs.
Key points
- A transient computational fluid dynamics (CFD) run iterates each time step to convergence, much like a small steady-state case, so the time step must be small enough for each one to converge.
- In a chilled water failure, the volume of water in the primary loop and the time it takes to circulate set how long the hall stays cool. Piping lengths, pipe diameters and the water temperature are needed inputs.
- In the example, the loop took about 66 seconds to circulate, and the hall had only a couple of minutes before racks reached the limit.
- The simulation shows which racks heat up first, which tells operators which servers to move or shut down first.
- Where the heat goes after a chiller failure (a cooling tower, a bypass heat exchanger, an economizer) and the time of year change the rate of rise, so the study is a systems analysis.
- The presenters stress that a transient run needs a person to check the time step and convergence, and that large meshes take hours even on a cluster.
- Server fans and rack controls are modeled in a simple way, with airflow proportional to load. The presenters note that manufacturer fan control logic is proprietary and can oscillate against room controls.